How it works
4 simple steps from first visit to handover.
- 11 hour
Survey
We measure, test moisture (below 3%, or a barrier first) and agree the layout, including any borders.
- 2If needed
Prepare
Old adhesive is removed and uneven areas are levelled so the tiles sit flat.
- 31 to 3 days
Lay
Tiles are laid in adhesive from centre lines, so the cuts at the walls are even, and rolled for a full bond.
- 4Same day
Finish
Trims are fitted at doorways and the floor is cleaned. A scrub and seal is optional.
How long it takes
Typical time on site for our team. Your quote confirms exact dates.
| Project size | Time on site |
|---|---|
| Up to 50 m² | 1 to 2 days |
| 50 to 200 m² | 2 to 4 days |
| 200 m²+ | Phased with you |
| After hours | Available on request |
Allow extra time where screeding, moisture barriers or old floor removal are needed.
Before we start
A few things that keep the job on time and the result right.
- Area cleared or phased
- Water and power available
- Slab dry or sealed with a moisture barrier
Questions
Can't see yours? Ask us.
Are vinyl tiles good for a warehouse or factory?
For foot traffic and light trolleys, yes. For forklifts we will recommend a heavier-duty solution.
Can damaged tiles be replaced?
Yes. That is a big advantage of tiles over sheet. We recommend keeping a box of spares.